Wednesday, 22 February 2012

Photos from the Inside



Work has continued this week, showers, door handles, mirrors the pantry and linen cupboards have shelving now.  The finial is on so the guard rail should hopefully come down soon.

We asked about doing the drive way but our site super said it was McDonald Jones company policy not to allow this before handover, I will try and push a little more when my client liaison officer gets back of holiday. It's going to be hard to keep the house clean without the driveway. Plan B is to make a path from some pavers we took up before the knockdown.

the finial (the piece of wood that sticks up like a lightning rod)

Main bath vanity with mirror

Main Bath Shower

Main Bath Towel Rack

Main Bath vanity standing next to the bath

Smoke detector and Air con vent  (don't forget the details)


Our Door Handles (upgraded from standard but common in display homes)

Double doors into Kitchen

En-suite Towel Rail

En-suite Shower (one level up from standard)

En-suite from over by the toilet
wardrobe fit out (standard rail and shelf)
we had a lot of elfa baskets and shelves in our old house that we are going to reuse

Looking at the front door from the end of the hallway




No comments:

Post a Comment