Lock Up Before Christmas



What a week for us
Gyprocking finished
Cornices finished
Internal doors done
Skirting boards almost done
Water proofing started

And the Laundry Door, Front Door, and tada the Garage Door, now all I need is a key so I could keep up with the progress inside.
Front entrance cornice
Front entrance cornice - close up


Water proofing en-suite

water proofing bathroom

Kitchen

Rear alfresco
Front door
Garage door

more garage door

Thursday, 15 December 2011

More Progress



This week sees the gable finished, 
more gyprocking and a meeting with our SS over some brick issues, all discussed and resolved.
More photos below


Gable in

Front entrance

main bed - ensuite to the left, robe to the right

front bedrooms looking through kids activity

Kitchen looking towards the back

Study

Kitchen looking from the back

Home theatre 

Sunday, 11 December 2011

Steam Rolling towards a Christmas Lock-up


December 1 saw the start of our inside work begin,

  • The electrical rough in was done
  • Eaves were started
  • Sliding door cavities installed
  • We had some brick cleaning done,


December 8 the Gyprock and a team of Gyprockers arrived

We spoke to our SS, he said that he was trying to get to lock-up before Christmas, and the Kitchen should be done in January,

With the Gyprock came a decision to change the Home Theatre and the Study back around, a quick measure  of our lounge and the size of the rooms meant that the Home Theatre was just to cramped, luckily the only extra cable we will need is the aerial which is easy to do after completion.


Front door

2 bedrooms up front

Ex home theatre, now the study 

ex study, now the home theatre

Gyprocking in the kids activity

Kitchen - dining

Home theatre, ex study